Installation & Commissioning Guide

Ensure your Beam Associates systems are installed, tested, and commissioned to specification.

Pre-Installation Checklist

Confirm site readiness before equipment arrives.

Site & Utilities

  • Verify electrical service, disconnects, and panel capacity
  • Confirm condensate drainage and clearances
  • Inspect curb, pad, or structural supports

Logistics

  • Staging area identified and access path cleared
  • Crane/rigging scheduled if required
  • Safety plan reviewed with onsite team

Commissioning Steps

Critical steps to validate performance and warranty coverage.

Startup & Leak Check

Charge verification, leak testing, and baseline operating pressures logged.

Controls Configuration

Setpoints, defrost schedules, BMS integration, and alarm verification.

Performance Validation

Load simulation where applicable, airflow measurement, and temperature mapping.

Handover & Training

Documentation, maintenance schedule review, and operator training.

Need Commissioning Support?

Our technicians can lead onsite startup, provide checklists, and train your team.