Installation & Commissioning Guide
Ensure your Beam Associates systems are installed, tested, and commissioned to specification.
Pre-Installation Checklist
Confirm site readiness before equipment arrives.
Site & Utilities
- Verify electrical service, disconnects, and panel capacity
- Confirm condensate drainage and clearances
- Inspect curb, pad, or structural supports
Logistics
- Staging area identified and access path cleared
- Crane/rigging scheduled if required
- Safety plan reviewed with onsite team
Commissioning Steps
Critical steps to validate performance and warranty coverage.
Startup & Leak Check
Charge verification, leak testing, and baseline operating pressures logged.
Controls Configuration
Setpoints, defrost schedules, BMS integration, and alarm verification.
Performance Validation
Load simulation where applicable, airflow measurement, and temperature mapping.
Handover & Training
Documentation, maintenance schedule review, and operator training.